Sunday, November 30, 2008
Side view of the stairs. Site built grill is held by rare earth magnets so that the owners can remove it to replace filters over the cold air return. Newel posts and handrail are site built also. Notice that the stairs fit around the window very tight.
Saturday, November 29, 2008
Friday, November 28, 2008
This is a 2 phase remodel. In this first phase we are relocating the upper stairway to the front entrance. We will remove the existing stairways in the second phase to make room for the kitchen remodel.
Here we have begun to demo the closet that opens into the first floor bedroom which can be seen in the background.
Here we have begun to demo the closet that opens into the first floor bedroom which can be seen in the background.
Subscribe to:
Posts (Atom)