Sunday, November 30, 2008

Side view of the stairs. Site built grill is held by rare earth magnets so that the owners can remove it to replace filters over the cold air return. Newel posts and handrail are site built also. Notice that the stairs fit around the window very tight.

Walls and ceiling plastered, closet door re-trimmed and stairs ready for stain.
The view from the office with the stairs roughed in. We will retrim the window and the closet door with the existing trim
Stair stringers installed with temp treads.
This is the half wall that was built upstairs for what will be the sitting area of a master bedroom suite.

Saturday, November 29, 2008


This is from the bedroom/office looking out into the front entry

Friday, November 28, 2008

This is a 2 phase remodel. In this first phase we are relocating the upper stairway to the front entrance. We will remove the existing stairways in the second phase to make room for the kitchen remodel.

Here we have begun to demo the closet that opens into the first floor bedroom which can be seen in the background.